Environmental engineering

Project sector: Tourism development

Project status: Completed

Project location: 7 km to Ghaemshahr city, Mazandaran Province

Project objective: Designing a tourist site  

Project starting date: January 2018

Project completion date: June 2018

Project duration: 5 Months

 

Abstract:  

Berenjestanak Dam is a small scale dam with 3 million cubic meters capacity of its reservoir which operated in 1994 with the purpose of irrigating cultivated lands. The Dam is located in the forest area with access to the transit road of Tehran-Ghaemshahr City and a 7 km distance from Ghaemshahr city near the Caspian Sea. The Dam’s lake with 40 hectares area is surrounded by dense forests and in combination with Berenjestanak village in its neighborhood and sloping hills, creates unprecedented landscapes.

Being in a pristine forest area in the heart of natural resources, having fantastic forest landscapes, and enjoying the silence and tranquility of the environment has created a wonderful site for relaxation which could be designed for a very attractive tourist site.

Janamai A 04 

Project outcome:

With regard to the potentialities of the study area and the view of designing a recreational site, the Tourism Development Plan of Berenjestanak Dam was designed with a focus on the multi-level accommodation facilities and supportive services for a short stay of visitors and tourists.

Accommodation facilities (luxury villas, tourist cottages, pergola), catering services (restaurants, coffee shops, donut boats, tea-house, supermarkets), recreational services (boating, fish breeding), entertainment facilities (recreational garden and flowering) and tourism infrastructure and supportive facilities (office building, parking, sailing docks, tourist tent structure, restroom, and other tourist facilities) are main components of the tourism development plan of the study area.

Berenjestanak

Following approval of the proposed tourism development plan of Berenjestanak Dam by official authorities and tender announcement by the employer, the investor of the plan was elected and under the supervision of the SAS, implementation of the proposed tourism development plan was started by the investor since March 2018.

By the time, part of the proposed projects of the designed site plan including the construction of the first phase of tourist cottages and restroom, preparing open-air restaurant and installation of pergolas with providing catering services and operating sailing dock, tourist boats, and donut boats have been completed and progress in the implementation of other projects is in the way.

IMG 4822

Project sector: Tourism Development

Project status: Completed

Project Location: Kamal Saleh Dam, Shazand District, Central Province

Project objective: Creating nature and sport tourist site downstream of Kamal Saleh Dam through the achievement of the feasibility study and designing a tourism master plan

Project starting date: December 2018

Project completion date: December 2019

Project duration: 12 months

 

Project sector: Tourism Development

Project status: Completed

Project location: Shoormast Lake, Pol Sefid City, Mazandaran Province

Project objective: Organizing tourism-related activities through preparing environmentally compatible tourism development plan around Shoormast Lake with limited capacity

Project starting date: August 2017

Project completion date: February 2018

Project duration: 6 months

 

Project sector: Tourism Development

Project status: Completed

Project location: Chaloos-Sardabrood Canal, Chaloos City, Mazandaran Province

Project objective: Development of tourism activities and designing recreational and amusement park along the water transmission canal of Chaloos and Sardabrood in a forest covered area

Project starting date: October 2017

Project completion date: November 2018

Project duration: 14 months

 

Project sector: Tourism Development

Project status: Completed

Project location: Tajan River, Sari city, Mazandaran Province

Project objective: River engineering with the aim of preservation of river banks and beds and development of tourism activities along the Tajan River

Project starting date: February 2018

Project completion date: December 2018

Project duration: 10 months

 

Central Office:

Central Office: Unit 2, No. 27, 39 Al., Sheikh Fazlollah Highway, Sattarkhan St., Tehran, Iran

Fax & Tel No.: +982166525297 and +982166533314-8

Email: [email protected]

location sattarkhan