Project sector: Operation and maintenance of irrigation & drainage networks
Project status: Ongoing
Project Location: Ilam Province
Project objective: Operation of network installations and sprinklers at the end of the Fakkeh and Eine khosh Channel, main pipelines of pressurized irrigation networks (degree 1& 2), drainage networks of Fakkeh and Eine khosh Channel, and main channels of these two plains, also all the installed valves on these pipes for transferring water to the delivery points (at the first of degree 3 of pipelines)
Project starting date: December 2019
Project completion date: December 2020
Project duration: One year